| Condition | Brand New |
|---|---|
| Warrantly | 18 Months |
| Spring Material | Rubber+Steel+Aluminum |
| Delivery | 1-3days |
| Iterm Name | Air Suspension Shock / Air Suspension System / Pneumatic Shock Absorber / Air Strut / Air Damper |
| Spring Material | Rubber+Steel+Aluminum |
|---|---|
| Application | W213 E-Class CLS C238 Front Coil Shock 4matic |
| Iterm Name | Air Suspension Shock / Air Suspension System / Pneumatic Shock Absorber / Air Strut / Air Damper |
| Stock | Yes |
| Adjustability | Adjustable |
| Voltage | 380V & 220V |
|---|---|
| Voltage | 380V & 220V |
| Core Components | Motor&Pump&Pressure Vessel&Engine |
| Core Components | Motor&Pump&Pressure Vessel&Engine |
| Condition | New |
| Description | Front Left And Right |
|---|---|
| Service | Accept Customize |
| OEM | 1663201413 1663202838 1663201468 1663201313 1663202738 |
| Adjustability | Adjustable |
| Packing | Neutral Packing Or As Requirement |
| Voltage | 380V/220V |
|---|---|
| Core Components | Motor, Pump, Pressure Vessel, Engine |
| Condition | Brand New |
| MOQ | 1 Pieces |
| Packing | Strong Wooden Box With Pallet |
| Spring Material | Rubber+Steel+Aluminum |
|---|---|
| Application | BMW X5 Front Shock Absorber |
| Stock | Yes |
| Iterm Name | Air Suspension Shock / Air Suspension System / Pneumatic Shock Absorber / Air Strut / Air Damper |
| Size | Standard Dimension |
| Stock | Yes |
|---|---|
| Service | Accept Customize |
| Description | Front Left And Right |
| Application | BMW X5 Front Shock Absorber |
| Transport Package | Carton |
| Spring Material | Rubber+Steel+Aluminum |
|---|---|
| Application | BMW X5 Front Shock Absorber |
| Size | Standard Dimension |
| OEM | 37116757501 37116761443 37116757502 37116761444 |
| Service | Accept Customize |
| Trade From | Guangzhou Factory |
|---|---|
| Car Make | Lincoln MKS MKT With Electric |
| Placement On Vehicle | Front, Left And Right |
| Weight | 8 Kg |
| Iterm Name | Air Suspension Shock Absorber For Benz W221 |
| Body Material | Steel+Aluminum |
|---|---|
| Warranty Time | 18 Months |
| Payment Term | Bank, Western Union, Paypal |
| Purpose | For Replace/repair |
| Trade From | Guangzhou Factory |